Lab

Approval race

Sequential and parallel approval, racing side by side. Add approvers and watch one flow stall while the other barely moves.

Add or remove approvers and watch the two flows race.

The prototype

Illustration, sample timings

Two ways to wait for approval

Each approver takes about two hours to respond in this example. Sequential approval waits for every level in turn. Parallel approval asks everyone at once, and the trip is booked when the last one says yes.

One at a time12 hours
All at onceUnder 2 hours
Approval time with 6 approversAbout 2 hours per approver
12h 00melapsed
ApproversHours each
6
One at a timeBooked after 12 hours
Approver 1Approver 2Approver 3Approver 4Approver 5Approver 6
All at onceBooked in under 2 hours
Approver 1Approver 2Approver 3Approver 4Approver 5Approver 6

How it's calculated

Sequential time is the number of approvers times the hours each. Parallel time is the slowest single approver, so adding approvers barely moves it.

The problem it explains

Before the corporate booking tool, a trip was approved over email, one person at a time. Take a sample of about two hours per approver. With six levels in a chain, that is about 12 hours of waiting, or a working day and a half, before anyone could book. These are sample timings for illustration, not measured results.

What the prototype shows

The top lane asks each approver in turn. The bottom lane asks all of them at once, and the trip is booked when the last one says yes. Add or remove approvers and the sequential total moves with every level. The parallel total barely moves.

That picture is the argument for parallel approval flows, and the platform lets a corporate run its levels in sequence or in parallel.

What the real engine adds

The approval engine behind it does more than pick a flow:

  • Up to six approval levels, run in sequence or in parallel.
  • Three structures: single level, anyone can approve, and multi-level.
  • Different flows for in-policy and out-of-policy trips, with conditional rules.
  • A wait time for approvers who do not respond, with an action when it runs out: approve, reject, send a reminder, or escalate.
  • Alternate approvers for when the primary one is away.

Parallel is not always the right answer. Some chains are sequential on purpose, when one approver should see a trip before the next. The engine lets a client say so, and makes the faster flow the easy one to choose.

Start a conversation

Have something in mind?

Start a conversation