Lab
Metric tree builder
Break a North Star into inputs a team can move, then nudge one and see how much reaches the top.
Nudge any input and watch how much of the change reaches the North Star.
The tool
Break the North Star down
Nudge any input and watch how much of the change reaches the North Star. Start blank to build your own tree.
North Star
Trips booked in policy per month
1,624
- Trips booked in policy per month
- Active travellers: computed
- Invited users: 4000
- Activation rate: 55%
- Trips per traveller: 0.9
- Search-to-book conversion: 18%
- Approval turnaround time: 6 h
- In-policy rate: 82%
- Searches showing policy flags: 70%
- Traveller satisfaction: 4.2
- Active travellers: computed
What if it rose 10%?
How it's calculated
North Star = input × input× input
- North Star
- The one number that best captures the value customers get from the product. It should move when they get more value, and only then.
- Inputs
- The metrics a team can actually move. When they multiply, a 10% gain on any of them is a 10% gain at the top, so pick the cheapest one to move.
- Influences
- Drivers with no clean formula, like approval speed shaping trips per traveller. Their effect is a hypothesis to test, not a calculation.
- Leading and lagging
- Leading metrics move first and can be acted on this week. Lagging ones confirm the result later. A tree with no leading metrics cannot steer anything.
- Guardrail
- A metric that must not get worse while you push the others. Pushing in-policy rate at the cost of traveller satisfaction is a win on paper only.
- Keyboard
- Tab to a metric, then use the arrow keys: up and down move between metrics, left goes to the parent, right to the first input. Enter or Space selects it.
Why I draw the tree
A North Star on its own is a scoreboard. Nobody wakes up and moves “trips booked in policy”. People move activation, conversion and approval speed, and the tree is how I show which of those actually adds up to the number at the top. I draw one at the start of every planning cycle, and every roadmap item has to point at a box on it.
Arithmetic or influence
The most useful habit is being honest about the links. Active travellers really is invited users times activation rate: that is arithmetic, and the tool computes it. Trips per traveller is not a formula of search conversion and approval turnaround time. They influence it, and how much is a question for an experiment, not a spreadsheet. I mark those links as influences so nobody reads a hypothesis as a fact.
Reading the what if
Nudge any input by 10% and the tree shows the effect on everything above it. In a tree that multiplies all the way up, every input gives the same 10% at the top. That is the point: once the maths is equal, the choice comes down to which input is cheapest to move, and that is usually a leading metric a team can touch this sprint. Additive branches behave differently, because a 10% gain on a small part moves the whole by less.
Leading, lagging and the guardrail
- Leading metrics move first and can be acted on this week. A tree with none cannot steer anything.
- Lagging metrics confirm the result later. They belong higher up.
- The guardrail is the metric that must not get worse while you push the rest. In corporate travel it is often traveller satisfaction: you can raise the in-policy rate by making booking painful, and you will lose the travellers who were booking at all.
Traps
Trees get deep fast. I stop at three levels because past that nobody reads them, and the bottom boxes turn into task lists rather than metrics.